Zwijnaarde Eiland

At the "Eiland" industrial zone in Zwijnaarde, Clasal successfully implemented several pumping systems. These installations are designed to handle up to 900 m³ of rainwater per hour, which is essential for effective water flow management on the site.

Where Clasal made the difference

Clasal took care of the execution of the various pump installations. This included the use of high-quality pumps and collectors and strict quality control to ensure that the installations met all specifications.

A key component of the project was the stainless steel collector with a diameter of 700 mm. This was manufactured by Clasal and given the necessary post-treatments. This collector is crucial in the water discharge process and was designed to ensure high throughput capacity.

Our contribution to the "Eiland" industrial zone in Zwijnaarde highlights our expertise in successfully executing complex pump installations and providing innovative solutions for our clients.