Projects

Clasal is proud of its projects in the areas of wellpoint dewatering, wastewater pumping installations, and contaminated groundwater remediation. Discover our realisations and see how we have applied our expertise to bring challenging projects to a successful conclusion.

introcenter

At the "Eiland" industrial zone in Zwijnaarde, Clasal successfully implemented several pumping systems. These installations are designed to handle up to 900 m³ of rainwater per hour, which is essential for effective water flow management on the site.

Clasal installed a network of dewatering pump systems around the buildings of AZ Zeno Knokke. These systems aim to mitigate water damage in the underground floors of the building.

The wellpoint dewatering for the Abu Dhabi-based Formula 1 Yas Marinv racing circuit was carried out with our ZD900 pumps.

For INEOS' 'Project One' in the port of Antwerp, Clasal supplied a large number of ZD 300 pumps. These take care of lowering the water table so that the foundations can be build. 

For more than 10 years, around 20 Jupiter and Goliath pumps have been continuously used for pumping historically contaminated groundwater.